A full day of work at great risk

Hello everyone, today I just have more time to work because 5 days one of my co-workers fell from a concrete pillar due to a broken foundation, and is still being treated at the hospital, please help pray for my friend.

IMG_20210824_211339.jpg

In a time that is still sad and mixed with fear, we still have to complete this work which is full of risks, the first point we have to complete is the installation of a double pole which will be used as a foundation or a transformer box holder.

What we installed was only one pole and the other one was there before, installing a new transformer here because there is a new housing opening around here which requires adding electrical power to this area, but today we did not install a transformer, the task of installing a transformer was assigned To another team, today we just put two poles at different points but the same area.

IMG_20210824_211359.jpg

After installing the first pole or point, we immediately proceed to the second point which will be used to supply electric current to the new housing that will be opened, here we are only assigned to install concrete poles when it comes to cables and others there has been no decision on which team who will install it, because the electric current will be used in two months, waiting for the completion of the road first.

IMG_20210824_211430.jpg

IMG_20210824_211312.jpg

Continue to the dismantling section of the old cable, because this cable will be disconnected from the electric current, in order to make it easier for later when dismantling the pole.

This cable is one current with the cable that we will install later, so the old one is removed first according to SNI.