20211126 Bungalow construction (Trimdek walls) - day 143

Inside the main space
00da182c-4cb8-4192-9ef0-cc64d48a9992.jpg

East swing wall. This entire wall swings open to offer an unobstructed view of the rice fields.
4e8a663a-01bd-44fe-9ff2-08e2f8a08266.jpg

West swing wall. This entire wall swings open onto the floating terrace and more rice fields.
7b9b4cdc-c41c-4d2d-b549-6eb27d3948cf.jpg

Kitchen side shutter work
b7be56cf-c1f3-4460-9d23-e7e16747e10e.jpg

Counter side with open shutter
f8376669-396c-46a6-91d0-607b66c1b784.jpg
4f70b08e-ef1f-4f99-9cdd-4a00b1b6d474.jpg
6ce8d289-6bc2-430e-8480-ec5f2a497e0f.jpg